SOQONO
Technical Operations Partner
Kepler — Phase 1 Throughput & Timeline

Soqono and Kadence partner on projects with complex technical operations. Soqono is a partner on the Kadence proposal for Kepler.

To support the project team, we developed an HTML-based simulation to model and visualize project throughput and timelines. Please note that this simulation serves as a visual guide; final feasibility and definitive schedule determinations require formal verification by both Soqono and Kadence.

Loading…
Option
Parameters
Volume
Devices
Not every device can be utilized at the same time. Some are always offloading data or recharging. Device utilization is the share actively collecting at any moment. It depends on the hardware and offload design (set by the engineering team), and ~50% is typical for prototypes limited by storage, battery, or heat.
Collection rate
Schedule
Project timeline
Prep Collection Between locations Past deadline Deadline Projected finish
Throughput
Week-by-week
Levers